Week 1:
31/01 – 06/02
During week 1 me and Andrei were assigned to read through QA 01-03.
We both read them and I made some notes on organisation and documentation standards.
When we make the GitLab I will upload them in digital form (A.K.A. in week 3).
Total hours spent: 2
Week 2:
06/02 – 13/02
In this week’s meeting we decided Andrei as out project leader. I have put myself forward to be QA manager.
Andrei tasked me with providing the team with a little presentation of the documentation template to give them further understanding of the formatting which we should be following.
Total hours spent: 1.5
Week 3:
13/02 – 20/02
This week we decided to meet up and catch up on all our progresses. Joseph showed us his draft document and we saw a presentation from Brandon on his UI Draft. Furthermore, Radek, Sander and Barrett talked on Skype regarding the program’s architecture.
I read through SE QA 2, 4 and 7. Using the knowledge from 2, I presented the rest of the group with the requirements for writing a document. Moreover, with 4 and 7 I uploaded two .txt files for document and UI document requirements.
Lastly, I’m still currently working on properly organizing our GitLab and storing all pre-GitLab content in it.
Total hours spent: 3
Week 4:
20/02-27/02
This week I did not personally do much, as I had a job interview in Shrewsbury and the flooding complicated the situation.
We met on the 25th to review Brandon’s document along with Andrei, Joseph and Barrett. We pinpointed one or two errors, but other than that he did a perfect job in accordance with QA.
In GitLab I made the folder for the Minutes and uploaded most of them in. Also created a tutorial folder for the 27th so that Barrett can upload his code in.
Total hours spent: 1
Week 5:
27/02 – 5/03
This week we met to review Joseph’s Test spec. He did an amazing job and we established that everything was according to QA’s standards. Other than that, we are starting research on Laravel and will soon begin work on the back-end of the program.
Total hours spent: 1
Week 6
5/03-13/03
This week I have not done anything but GitLab maintenance. This is due to our Web Design assignment which I preferred to focus on.
Total hours spent: 1
Week 7 & 8
13/03-26/03
Due to the uncertainty and rapid changes of the Coronavirus pandemic, I haven’t done anything of notice. I concentrated on personal matters and my industrial year, therefore leaving the group project a bit behind.
Total hours spent: 0